Why a Written RFQ Beats “Send Me Your Price List”
“Please send your price list” usually produces the cheapest configuration a supplier can show you. You may receive a product photo, a headline specification, and a number with no clear statement of what is included. One supplier may quote a complete package while another quotes a bare device.
A written request for quotation (RFQ) changes the conversation. It states the treatment, workload, room conditions, documents, service, shipping basis, and acceptance requirements before a supplier calculates the offer. The supplier must answer at a level you can check: model code, parameter, handpiece count, warranty scope, lead-time start date, and document package. That record also gives your team something to compare after a sales call.
An RFQ is not a demand for a lower number. It is a request for a defined scope. If a supplier cannot answer one line, mark the gap instead of filling it with an assumption. That record supports purchasing, installation, training, and acceptance.
Before You Write the RFQ: Four Decisions
What treatment you are actually selling
Start with the outcome you plan to sell, not the machine name. Hair reduction, pigmentation work, vascular treatments, tattoo removal, skin resurfacing, and body contouring can require different technical routes, applicators, safety controls, and operator training. Write the intended treatment, target area, client profile, and any boundaries on claims. If you are still choosing a category, use this spa and clinic equipment sourcing overview and the aesthetic equipment sourcing guide by device category to frame the questions. A precise use case keeps a sales pitch from deciding your specification for you.
Expected throughput per week
Estimate treatments per week, average session length, peak-day demand, and the number of operators who may share the device. Throughput affects the power level, duty cycle, cooling capacity, applicator mix, and whether one handpiece can serve your schedule. It also affects downtime risk: a single shared handpiece may become a bottleneck even when the main unit has adequate output. Ask suppliers to state which configuration supports your workload and what operating limits apply. Do not accept “for professional use” as a workload calculation.
The room: power, water, cooling, floor loading
Many avoidable returns begin with the room. Record available voltage and frequency, socket type, circuit capacity, ventilation, ambient temperature, water supply or drain requirements, cooling clearance, door width, lift capacity, and floor loading. Ask whether the quoted cooling method needs a connection, refill, drainage, or regular cleaning. Put the room information in the RFQ and request written installation prerequisites. A device that performs well in a brochure may still be unusable if it cannot enter the room, share the circuit, or operate within the site conditions.
Budget band and what it includes
Set an internal budget band, then define the scope behind it. Separate the machine, optional applicators, freight, insurance, import duty, local tax, training, installation, and first consumables order. Ask suppliers to list included and excluded items rather than forcing every cost into one headline figure. Keep the quote in the supplier’s stated currency and ask them to confirm at quotation for items that depend on destination or configuration. A budget decision is only meaningful when the same landed and operating scope is used for each supplier.
The 13-Point RFQ Checklist
| # | What to ask for | Why it matters | Red flag in the reply |
|---|---|---|---|
| 1 | State the exact model code and configuration included in this quotation. | You cannot compare or accept equipment without a defined baseline. | The reply names only a product family or uses “standard model.” |
| 2 | Provide published technical parameters as numbers, including wavelength, energy density, pulse width, spot size, repetition rate, rated power, and cooling method. | Numbers let you test fit against the treatment and room. | The supplier substitutes words such as “high power” for measurements. |
| 3 | List each applicator or handpiece, its count and size, and whether spares are included. | Missing applicators can change both capability and operating cost. | The answer says “full accessories” without a list. |
| 4 | Attach certification documents as files with the model number and issuing body visible. | You need evidence tied to the quoted product, not a verbal assurance. | The supplier says “certified” but will not share a copy. |
| 5 | Define warranty scope, covered parts, exclusions, and who pays return freight. | A warranty label alone does not show your real exposure. | It states only a duration with no covered parts or process. |
| 6 | List consumables and spare parts with unit price, rated life, and restock lead time. | Recurring items can dominate five-year operating cost. | The supplier refuses to separate consumables from the machine price. |
| 7 | Describe training format, language, staff limit, and included materials. | Unclear onboarding creates inconsistent use and avoidable downtime. | Training is promised but not defined. |
| 8 | Describe installation and commissioning, responsible party, coverage, and acceptance criteria. | You need a clear handover point before final payment. | “Installation available” appears without scope or test. |
| 9 | State lead time, its start date, and shipping terms such as EXW, FOB, CIF, or DDP. | A delivery promise is meaningless without a trigger and trade term. | The supplier gives a calendar estimate but no start event. |
| 10 | Provide packing dimensions and gross weight for freight and customs calculation. | Volume and weight affect landed cost and site handling. | Only the machine’s net weight is supplied. |
| 11 | State payment milestones, what triggers the balance, and who bears bank charges. | Payment risk is tied to an objective delivery and acceptance event. | The reply requests a deposit without defining the balance trigger. |
| 12 | State after-sales response time, support channels, and how many years spare parts remain available. | Support capacity matters when a device is generating appointments. | “Lifetime support” replaces a process and availability statement. |
| 13 | List the import documentation package: commercial invoice, packing list, certificate of origin, manuals, and MSDS where applicable. | Missing documents can delay clearance or safe operation. | The supplier says documents will be handled later. |
1. Exact model code and configuration
Ask for the model code, software version where relevant, included modules, and every option used to calculate the quotation. Copy that code into your comparison sheet and purchase order. If the supplier proposes two configurations, require two separate totals and a clear list of differences. Do not compare a base unit against a package with extra handpieces. If laser hair removal is your use case, compare the scope against our guide to laser hair removal machine suppliers and keep the model identity visible in every attachment.
2. Numeric technical parameters
Ask for a parameter sheet, not marketing copy. Check that each number has a unit and that the parameter applies to the quoted configuration. Ask whether a value is maximum, nominal, adjustable, or measured at the applicator. Record wavelength, energy density, pulse width, spot size, repetition rate, rated power, and cooling method in separate cells. If a supplier cannot disclose a parameter, mark it as not provided and ask whether a test report or operating manual explains the limitation.
3. Applicators and handpieces
Request a line-by-line accessory schedule with quantity, size, connector, intended use, and spare status. Ask whether each item is supplied in the box or is an optional add-on. Confirm that the quotation includes the handpieces needed for your stated treatments and throughput. Ask how a failed applicator is diagnosed and whether replacement requires a service visit. “Complete kit” is not a specification; an itemized list is. Photograph or scan the final schedule into your purchasing file.
4. Certification documents
Request file copies and compare the model number on each certificate with the model number on the quotation, character by character. Check whether the document covers the complete device or only a component, and identify the issuing body, scope, and validity information. CE marking is not the same thing as FDA registration, FDA 510(k) clearance, or ISO 13485 certification. These describe different regulatory or quality contexts. Never treat a supplier’s statement that a product is “FDA approved” as a substitute for the relevant document and scope.
5. Warranty scope
Ask the supplier to define covered parts, labor, software, consumables, misuse exclusions, response procedure, repair location, and return freight responsibility. Ask when coverage starts: shipment, delivery, installation, or acceptance. A written process matters more than a duration printed beside the product photo. If the device is held at a service center, ask who pays outbound and return freight and what happens if the reported fault cannot be reproduced. Save the warranty version attached to the quotation.
6. Consumables and spare parts
Build a recurring-cost list before comparing totals. Ask for unit price, rated life, replacement trigger, storage requirement, and restock lead time for every consumable and likely spare. Separate items used per treatment from items replaced after a service interval. Ask whether prices apply to the quoted configuration and whether minimum order quantities apply. A supplier that will not disclose consumable pricing prevents a fair ownership calculation. Record “confirm at quotation” for any destination-dependent charge instead of inventing an estimate.
7. Training
Ask who delivers training, in what language, in which format, and for how many staff. Request the agenda, operator manual, safety materials, treatment parameters, troubleshooting guide, and any completion record. Clarify whether training is live, recorded, remote, or on-site, and whether follow-up questions use a named channel. Match the training scope to your treatments and staff turnover. A certificate of attendance is not the same as evidence that operators can set up, use, clean, and shut down the equipment correctly.
8. Installation and commissioning
Ask who performs installation and what “commissioning” includes. Require a checklist covering unpacking, room prerequisites, electrical or cooling connections, safety checks, test firing or functional testing where applicable, operator orientation, and handover documents. Define acceptance criteria in advance: for example, the quoted configuration is present, the unit powers on, accessories match the schedule, and agreed functional checks pass. Tie the final payment trigger to the agreed acceptance event, not to an informal message that the shipment has arrived.
9. Lead time and shipping terms
Ask when lead time starts: deposit receipt, approval of artwork, confirmation of configuration, or another event. Ask the supplier to state the shipping term and named place, then identify which party handles export clearance, main carriage, insurance, import clearance, and final delivery. EXW, FOB, CIF, and DDP allocate responsibilities differently. Ask what happens if a component is backordered. “Ready soon” cannot support a launch plan; a dated trigger and written update process can.
10. Packing dimensions and gross weight
Request the number of packages, outside dimensions, gross weight, stackability, shock or tilt indicators where used, and any special handling requirement. Give the information to your freight forwarder and customs broker for a landed-cost check. Confirm whether the dimensions include the pallet or crate. Also compare the largest package with your door, lift, corridor, and storage space. Net machine weight is not enough to plan delivery, and a freight quote based on incomplete dimensions can change after dispatch.
11. Payment terms
Ask for the milestone split and the document or event that triggers each payment. Define whether balance payment follows production completion, inspection, shipment, installation, or acceptance. Ask who bears bank charges, intermediary fees, and currency-conversion costs. Keep the payment schedule next to the configuration and acceptance criteria so that commercial terms cannot drift away from technical scope. If the supplier proposes a change after quotation, request a revised quotation rather than approving a new amount in a chat thread.
12. After-sales support and parts availability
Ask for support channels, business hours, first-response target, escalation path, remote-diagnosis method, and the information required when opening a case. Ask how many years key spare parts are expected to remain available and whether availability is subject to a minimum order. Identify who supports your country or language and whether firmware or parameter updates have a documented process. “We will support you” is a good intention, not an operating model. Put the response path in your internal service file.
13. Import documentation package
Ask the supplier to confirm the commercial invoice, packing list, certificate of origin, manuals, and MSDS where applicable. Check which documents show the exact model, consignee, package count, and description your broker needs. Request draft copies before shipment when your customs process requires review. Keep translated safety information with the machine file. Missing paperwork can create clearance delays even when the equipment itself is ready, so treat documentation as part of the deliverable rather than an administrative afterthought.
Copy-and-Paste RFQ Email Template
Subject: RFQ — [treatment] equipment for [clinic/distributor] in [country]
Hello [name],
We are evaluating equipment for a [clinic/salon/distributor] serving [client or treatment profile], with an expected workload of [sessions or treatments] per week.
Please quote the exact model and configuration suitable for [treatment], including [required handpieces/applicators] and room requirements of [power/cooling/space details].
Please answer the attached 13-point RFQ checklist, including numeric parameters, certification file copies, warranty scope, consumables, training, installation, lead time, shipping terms, payment milestones, and import documents.
Please list included and excluded items separately and state the quotation validity period.
Regards,
[name] | [company] | [country]
This format gives the supplier enough context to calculate a real configuration while keeping the answer structured. The validity period matters because configuration, freight, currency, or documentation scope can change. Separate consumable lines prevent a low machine number from hiding recurring cost. Keep the email and attachments with the final purchase order.
How to Normalize Three Quotes Into One Comparison
| Attribute | Supplier A | Supplier B | Supplier C |
|---|---|---|---|
| Configuration | |||
| Handpiece count | |||
| Certification files | |||
| Warranty scope | |||
| Consumable unit price | |||
| Lead time | |||
| Payment conditions | |||
| Opleiding |
Normalize before you rank. Put the same model scope, applicator count, document status, warranty boundary, and shipping basis into the same row. If an answer is missing, use “not provided,” not zero.
The machine price is not the ownership cost. A five-year total should include the machine, consumables, service, training, freight, import handling, and downtime. Use expected treatment volume and documented consumable life, then label assumptions. For a category-specific example, see what a tattoo removal machine actually costs over five years; for body treatments, our body contouring machine buying guide applies the same five-year view to cryolipolysis, EMS and cavitation options. A lower purchase figure can be more expensive when parts or support are weak.
A Weighted Scoring Matrix
| Criterion | Gewicht | Scoring prompt |
|---|---|---|
| Technical fit | 30% | Does the documented configuration fit the treatment, workload, and room? |
| Documentation and compliance | 20% | Are model-linked documents available and understandable? |
| Service and parts | 20% | Can the supplier support faults and recurring parts? |
| Price and TCO | 20% | What is the five-year cost under the same assumptions? |
| Training and onboarding | 10% | Can the team operate and accept the equipment safely? |
Score each supplier against evidence, not confidence. A high technical-fit score requires documented parameters for the quoted model and a configuration that matches the room; adjectives and blank values lower it. Adjust the weights for your business, but set them before reading headline numbers. Otherwise the lowest initial price becomes the anchor.
Red Flags in Supplier Replies
- Only pictures, no parameter sheet: attractive images cannot show whether the quoted configuration fits your treatment or room.
- Parameters described as “high power” or “latest technology”: adjectives prevent a technical comparison and should trigger a request for units and test conditions.
- Certification offered only as a verbal claim: ask for the file, model match, issuing body, and scope before treating it as evidence.
- Warranty says “one year” without covered parts: the duration leaves exclusions, freight, and repair responsibility unresolved.
- Pressure to pay a deposit without a quotation validity period: urgency should not replace a stable scope and a written commercial record.
- Refusal to state consumable unit prices: the supplier is asking you to approve ownership cost without the recurring inputs.
FAQ
What is an RFQ, and how is it different from asking for a price?
An RFQ is a structured request for a defined configuration and commercial offer. It explains the treatment, workload, room conditions, documents, service, shipping basis, and payment expectations. Asking for a price alone usually produces a headline number for an unspecified package. An RFQ creates a written record that lets you compare suppliers, clarify exclusions, and check the delivered equipment against what you approved.
How many suppliers should I send an RFQ to?
Send the same RFQ to enough qualified suppliers to create a meaningful comparison without creating an unmanageable review process. A practical shortlist can include several suppliers whose treatment category, documentation, service coverage, and shipping capability fit your market. The key is consistency: use the same model scope, questions, deadline, and clarification process. More replies do not improve the decision if each supplier answers a different brief.
What should I do if a supplier refuses to share certification documents?
Record the refusal and ask whether a redacted copy or an official verification route is available. Do not mark the document requirement as satisfied because the salesperson says the product is certified. Ask for the model number, issuing body, scope, and applicable validity information. If the supplier still refuses, score documentation risk accordingly and decide whether your regulator, customs broker, insurer, or internal compliance process permits you to continue.
Should I ask for a sample or a demo before ordering?
Ask for a demo, sample treatment, video evidence, or reference workflow when it can answer a material question about usability, output, cooling, ergonomics, or training. Define what you will observe and how the result will be recorded. A demo does not replace document review, model confirmation, room checks, or a written acceptance plan. Treat a demonstration unit and the quoted production configuration as separate items unless the supplier confirms that they match.
How long should a quotation stay valid?
Ask the supplier to state a quotation validity period that fits your approval, compliance, freight, and purchasing timeline. The right period depends on configuration, destination, currency, and shipping conditions, so it should be confirmed in writing rather than assumed. If it expires, request a refreshed quotation with every changed item identified. Never carry an old price forward while silently changing the model, shipping term, accessories, or payment milestones.
Send Us Your RFQ
You can send your completed RFQ directly to Konmison through our contact page. Include the treatment, workload, room conditions, required documents, and the 13 checklist questions. We can answer line by line so you can see what is included, what needs confirmation, and which assumptions belong in your comparison. Keep the returned quotation with your supplier review and acceptance records.